AbouRizk, S M and Dozzi, S P (1993) Application of Computer Simulation in Resolving Construction Disputes. Journal of Construction Engineering and Management, 119(02), 355–73.

Barnes, W C (1993) Microcomputers in Management of Construction Operations. Journal of Construction Engineering and Management, 119(02), 403–12.

Bernold, L E and Salim, M (1993) Placement‐Oriented Design and Delivery of Concrete Reinforcement. Journal of Construction Engineering and Management, 119(02), 323–35.

Carr, R I (1993) Cost, Schedule, and Time Variances and Integration. Journal of Construction Engineering and Management, 119(02), 245–65.

East, E W and Kim, S (1993) Standardizing Scheduling Data Exchange. Journal of Construction Engineering and Management, 119(02), 215–25.

Ioannou, P G and Liu, L Y (1993) Advanced Construction Technology System—ACTS. Journal of Construction Engineering and Management, 119(02), 288–306.

McCullouch, B G and Gunn, P (1993) Construction Field Data Acquisition with Pen‐Based Computers. Journal of Construction Engineering and Management, 119(02), 374–84.

Miyatake, Y and Kangari, R (1993) Experiencing Computer Integrated Construction. Journal of Construction Engineering and Management, 119(02), 307–22.

Russell, A D (1993) Computerized Daily Site Reporting. Journal of Construction Engineering and Management, 119(02), 385–402.

  • Type: Journal Article
  • Keywords: Computer applications; Construction sites; Data collection; Data processing; Feedback control;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1993)119:2(385)
  • Abstract:
    This paper describes a computerized approach for collecting and processing site information that builds on the traditional superintendent's daily site report. System design considerations and features, lessons learned from field use, and future extensions are highlighted. Goals include improvements in the ease and accuracy with which field data can be recorded and processed to produce fast feedback on project status and problems. Benefits claimed for the approach include development of a coherent picture of the current status of a project and how it got there; faster response time in dealing with problems; integration of the site reporting, project planning, and project scheduling functions; an increased likelihood of schedule updating and speedier updating (thus leading to increased schedule credibility); help in dealing with claims; and documentation of experience in a form useful for future projects.

Russell, A D and Wong, W C M (1993) New Generation of Planning Structures. Journal of Construction Engineering and Management, 119(02), 196–214.

Tommelein, I D and Zouein, P P (1993) Interactive Dynamic Layout Planning. Journal of Construction Engineering and Management, 119(02), 266–87.

Vanegas, J A, Bravo, E B and Halpin, D W (1993) Simulation Technologies for Planning Heavy Construction Processes. Journal of Construction Engineering and Management, 119(02), 336–54.

Yates, J K (1993) Construction Decision Support System for Delay Analysis. Journal of Construction Engineering and Management, 119(02), 226–44.